Onshore and Offshore Pipe Laying

Pipeline installation across swamp, land and shallow water, including tie-ins, crossings and pre-commissioning.

Swamp, land and shallow water

Stringing, welding, lowering-in and tie-ins

Terrain drives the method: barge spreads in the creeks, conventional spreads on land, and a crossing plan agreed with the operator before a single joint is strung.

We install pipelines across the full range of Niger Delta terrain, from dry land through swamp to shallow water. Right-of-way preparation, stringing, welding, coating of field joints, lowering-in and backfill are run as one spread under a single superintendent.

Road, rail and river crossings are engineered case by case, and pre-commissioning — cleaning, gauging, hydrotest and dewatering — is completed before the line is handed over.