Equipment

Our Standard Fabrication Workshop

Covered bays, overhead craneage and a lay-down area sized for large-diameter spools — the plant behind every schedule we commit to.

Owned plant, not hired promises.

Craneage, fabrication bays, swamp buggies and test units on our own books. Owning the spread is why our schedules hold when a third party would be waiting on availability.

  • Standard fabrication workshop

    4,000 m² covered bay with overhead craneage to 20 tonnes

    • Year : 2009
    • Status : Owned
  • Crawler crane, 150 t

    Lattice boom to 84 m, rated 150 tonnes

    • Year : 2016
    • Status : Owned
  • Swamp buggy spread

    Two buggies with support barges for swamp pipeline work

    • Year : 2019
    • Status : Leased
  • Hydrostatic test unit

    Rated to 350 bar with data logging

    • Year : 2021
    • Status : Owned

Equipment list

AssetCapacitySectorYearStatus
Standard fabrication workshop4,000 m² covered bay with overhead craneage to 20 tonnesOnshore2009Owned
Crawler crane, 150 tLattice boom to 84 m, rated 150 tonnesOnshore2016Owned
Swamp buggy spreadTwo buggies with support barges for swamp pipeline workOnshore2019Leased
Hydrostatic test unitRated to 350 bar with data loggingOnshore2021Owned